- Municipality of Titel
- Logistics
- Energy potential
- Infrastructure
- Population education and labor cost
- Key sectors
- Top 10 employers
- Greenfield
- Brownfield
- Construction procedures
- Success stories
- Your partner in municipality
Municipality of Titel
Titel is a town and municipality in the South Backa District of the Vojvodina, Serbia. The municipality has a population of 15,738. It is located in southeastern part of Backa, known as Sajkaska. Titel municipality encompasses the town of Titel, and the following villages: Vilovo, Gardinovci, Lok, Mosorin, Sajkas.

TOP 5 REASONS TO INVEST IN TITEL
- Favorable geographical position - Proximity of main industrial centers and rivers Danube, Tisza, Begej
- Access to skilled workforce
- Availability of both Greenfield & Brownfield locations
- Broad set of municipal incentives – various fee rates
- High-quality agricultural land
Titel Logistics
Titel total area 262 km²
Distance from borders:
- HUN - 161 km
- CRO - 170 km
- ROM - 140 km
- BUL - 372 km
- B&H - 144 km
Distance from highway:
- E-75 - 3 km
- E-70 - 3 km
Distance from airport:
- Belgrade - 60 km
- Osijek - 159 km
- Timisoara - 125 km

Energy potential in Titel
GAS
- Municipality is gasified: 100%
- Local pipeline lenght: 152 km
- Presure on main pipeline max 50 bar
- Presure on local pipeline max 4 bar
BIOMASS
- Total land: 26,219 ha
- Agricultural land: 20,926 ha
- Arable land: 18,562 ha
- Most common crops: wheat, barley, maize, sunflower, soy
ELECTRICITY
- No. of distribution substations: 42
- Total network length (km): 200
SOLAR
Insolation 270 days p.a. | 2,000 hrs |
Infrastructure in Titel
ROADS
Regional road network: 31 km
- Backo Gradiste-Curug-Zabalj-Sajkas-
- Kac-Sajkas-Titel-Perlez-Kovacica-Secanj
Local road network: 108 km
- Sajkas-Mosorin
- Road 129
- Gardinovci-road 129
- Gardinovci-Kovilj
- Titel-Mosorin
- Vilovo-Mosorin
WATERWAY
River Tisza & Danube lenght: 46 km
- Port in Novi Sad distance 50 km
Canal network lenght: 205 km
Irrigation/drainage system network: 2,000 ha
RAILWAY
Railway network length: 23 km
- Novi Sad - Orlovat
Axial pressure: 16 t; 32 t
SEWAGE
Sewage system: 15%
Sewage network lenght: 12 km
Population, education and labor cost in Titel
Number of inhabitants 15,738
Employed (2019) 2,285
Unemployed (April 2020) 710
Labor cost structure
Average salary in Titel (August, 2018)
NET Salary | 335 | |
Personal Income Tax | 10.00% | 33 |
Contributions (Emploeyee) | 19.9% | 91 |
GROSS Salary | 460 | |
Contributions (Employer) | 17.9% | 91 |
TOTAL Cost | 542 |
From July 1st, 2014, until December 31st 2019, the employers have the right for refund on the paid personal income tax & socal insurance contributions:
- 65% refund for employing 1-9 workers
- 70% refund for employing 10-99 workers
- 75% refund for employing 100+ workers
Average Salary for Production sector in Vojvodina, November 2017
NET: € 398
GROSS: € 550
TOTAL COST: € 648
Average salary (total cost) for 2017 €461
Education
High Schools
School | Profile | #students | #graduates |
---|---|---|---|
Vacational High School | Economics | 186 | 42 |
AC Equipment Mechanics | 19 | 8 | |
Car mechanics | 23 | 10 | |
Culinary | 46 | 12 | |
Tourism | 75 | 24 | |
Hospitality | 22 | 10 |
Only 40 km to Novi Sad where all high school profiles and universities are available.
Key sectors in Titel

Agribusiness
Processing capacites expansion
- 22,267 ha of high-quality agricultural land with the possibility of irrigation – 2,000 ha of irrigation/drainage network
- Livestock expansion potential due to high percentage of rural population and access to pastures
- Cereals crops – 13,050 ha
- Industrial crops – 4,900 ha
- Investment opportunities: Processing capacities development: cereals, fruit & vegetables, meat & dairy

Tourism
Diverce natural potentials
- Exceptional natural resources: two rivers (Tisza, Danube), natural reservoir (Titelski breg)
- Development potential for: Nautical tourism, Eco-tourism, Sports-recreational tourism, Hunting and fishing tourism, Event tourism, Rural Tourism
- Specific geographical position - makes it a potential nautical resort
- More than 20% of foreign tourist visits
Investment opportunities:
- River Tisza pier/coastal development
- Marina development
- Accommodation capacities development

Metal Proccesing
Long tradition dating back to 1960‘s
- Potential for cooperation with local suppliers
- A number of suitable Brownfield locations
- Former FOMG company location – production of metal equipment
Established in 1962 as a workshop, developing to a company for making metal products and metal cage equipment. In 1985 new production facility of 2,000 sqm has been built. In 1988 another hall for galvanizing treatment of metal has been built (decorative chrome plating, galvanization, and hard chromium plating) - with a system for wastewater treatment. The company used to employe more than 200 workers until it went under bankuptcy in 2012.
Bidding price is € 243,000 - Former Agroocoop AD company location – 9,326 m²
Top 10 Employers in Titel
Company | Sector | Country | #Employees |
---|---|---|---|
CIRIC ARO MDZ DOO | Agribusiness | Serbia | 53 |
POLY VERBUND PREMIX DOO | Plastics | Serbia/Germany | 37 |
IRIS FARM | Pharmacy | Serbia | 22 |
NELT DOO | Plastics | Serbia | 16 |
OZZ SAJKASKA | Agribusiness | Serbia | 14 |
RADULOVIC | Tourism | Serbia | 13 |
ENTERIJER PETROVIĆ | Wood processing | Serbia | 11 |
PROFIAKRIL DOO | Plastics | Serbia | 11 |
CIGLANA | Brick production | Serbia | 10 |
TITEL COOP DOO | Agribusiness | Serbia | 9 |
Greenfield locations in Titel
Location 1
Industrial zone – Titel South 1
Land size: 450 ha
Available: 35 ha
Ownership: municipality
Infrastructure: gas, optical cable
Airport distance – 77 km
Port distance – 25 km
Highway distance – 18 km
Railway distance – 2 km
For sale and lease


Location 2
Industrial zone – Mosorin
Land size: 34 ha
Available: 34 ha
Especially suitable for setting-up production for dairy processing, abattoir, biomass – due to dominantly developed agricultural sector (one of the largest milk producers in South Backa district , where there several thousand fattening pigs
Ownership: state
Infrastructure: electricity, water
For sale and lease
Location 3Industrial zone – Šajkaš
Land size: 140 ha
Available: 140 ha
Ownership: state
For sale
Brownfield Locations in Titel
Location 1
Agrocoop AD
Land size: 9,326 m²
Infrastructure: electricity, water, gas, sewage, optical cable
Ownership: bankruptcy
For sale

Upon receiving the investor’s request
the consolidated construction procedures are conducted in the following phases:
- Issuing the location conditions for the cadastre parcel suitable for construction – from the day of obtaining all special conditions, permits and other documents --> no later than 5 working days
- Issuing the construction permit – from the day of the submission of the request --> no later than 5 working days
Upon receiving the application:
Based on registering the construction work,issuing the verification for receiving the application without delay, provided that the complete documentation has been submitted.
- Registering the construction works to receive acceptance/rejection --> 5 working days
- Subsequently, submitting the request for infrastructure installations --> 3 working days
Issuing the occupancy permit, upon receiving the submission of the request --> no later than 5 working days
Issuing the final approval upon receiving the submission of the request --> no later than 5 working days
In total: 28 working days
Success Stories in Titel

Your partner in Municipality
Municipality Office
Zorica Kurucin – Local Economic Development Office
Phone: +381 21 29 60 186