- City of Sremska Mitrovica
- Logistics
- Energy potential
- Infrastructure
- Population education and labor cost
- Key sectors
- Top 10 employers
- Greenfield
- Construction procedures
- Success stories
- Your partner in municipality
City of Sremska Mitrovica
Sremska Mitrovica is a city and municipality located in the Vojvodina province, Serbia, on the left bank of the Sava river. It is the administrative centre of the Syrmia District. Sremska Mitrovica municipality includes the city of Sremska Mitrovica, the town of Macvanska Mitrovica, and several villages.

TOP 5 REASONS TO INVEST IN SREMSKA MITROVICA
- Excellent geostrategic position
- Modern Industrial Zone
- Efficient administration
- Large pool of available educated workforce
- A municipality with a clear vision-Ready technical documentation
Sremska Mitrovica Logistics
Total Area: 762 km²
Distance from borders:
- HUN - 173 km
- CRO - 30 km
- ROM - 175 km
- BUL - 320 km
- B&H - 35 km
Distance from highway:
- E-75 - 40 km
- E-70 - 0 km
Distance from airport:
- Belgrade - 50 km
- Osijek - 115 km
- Timisoara - 210 km

Energy potential in Sremska Mitrovica
GAS
- Municipality is gasified: 78%
- Local pipeline lenght: 233 km
- Presure on main pipeline 8 bar
- Presure on local pipeline 3 bar
BIOMASS
- Total land: 76,200 ha
- Agricultural land: 56,300 ha
- Arable land: 54,100 ha
- Most common crops: cereals, industrial crops, roughage
ELECTRICITY
- No. of distribution substitusions: 354
- Total power (kVA): 150,750
- Total network length (km): 302
- Available capacities (kVA): 50,000
WIND
Average speed 3.5-4 m/s at 50 m
GEOTHERMAL
31°C temperature | at 452 m |
SOLAR
Insolation 68 days p.a. |
Infrastructure in Sremska Mitrovica
ROADS
Highway E70 lenght: 25 km
Regional road network: 150 km
- Beograd-Croatia border
- Nestin-Erdevik-Kuzmin-B&H border
- Sremska Mitrovica-Bogatic-
- Novi Sad -Irig-Ruma-Sabac-Valjevo-Pozega-Ivanjica-Sjenica
- Sremska Mitrovica-Svilos
Local road network: 103 km
- Crveni Cot-Djipsa
- Besenovo-Mandjelos
- Lacarak-Calma
- M. Mitrovica-Ravnje
- Crveni Cot-B. Prnjavor
- Divos-S. Bingula
- Nocaj-Radenkovic
WATERWAY
River Sava lenght
- Port in Sremska Mitrovica distance 1 km
Canal network for drainage: 3,628 ha
Irrigation/drainage system network: 1,202 ha/946 ha
SEWAGE
Sewage system: 60%
Sewage network: 150 km
Population, education and labor cost in Sremska Mitrovica
Number of inhabitants 79,940
Employed (2020) 20,395
Unemployed (July 2021) 3,211
Labor cost structure
Average salary in Sremska Mitrovica (August, 2018)
NET Salary | 391 | |
Personal Income Tax | 10.00% | 41 |
Contributions (Emploeyee) | 19.9% | 107 |
GROSS Salary | 539 | |
Contributions (Employer) | 17.9% | 97 |
TOTAL Cost | 635 |
From July 1st, 2014, until December 31st 2019, the employers have the right for refund on the paid personal income tax & socal insurance contributions:
- 65% refund for employing 1-9 workers
- 70% refund for employing 10-99 workers
- 75% refund for employing 100+ workers
Average Salary for Production sector in Vojvodina, November 2017
NET: € 398
GROSS: € 550
TOTAL COST: € 648
Average salary (total cost) for 2017 €628
Education
High Schools
School | Profile | #students | #graduates |
---|---|---|---|
Economics | Economics | 234 | 55 |
Finance Admin | 109 | 22 | |
Business Admin | 118 | 24 | |
Legal | 125 | 28 | |
Tourism | 113 | 33 | |
Hospitality | 102 | 12 | |
Culinary | 86 | 31 | |
Food, Forestry & Chemical school | Environmental Protection | 79 | 23 |
Industrial Pharmaceutical | 92 | 29 | |
Graphical Production | 19 | 19 | |
Food Tech | 52 | 16 | |
Forestry Tech | 84 | 22 | |
Technical | Hunting & Fishing Tech | 55 | 17 |
Landscaping Tech | 55 | 22 | |
Interior Design | 74 | - | |
Primary Woodworking Tech | 16 | 24 | |
Electrotech-Computers | 118 | 28 | |
ICT Electrotech | 119 | 30 | |
Electrotech-AC Equipment | 83 | 115 | |
Mechanical Tech-Computer Engineering | 79 | 14 | |
Computer System Electrotech | 77 | - | |
Car mechanics/Mechanics-AC Equipment | 74 | 28 | |
Locksmith | 27 | - | |
Architectural Tech | 82 | 13 | |
Medical | Nursing Tech | 352 | 90 |
Psysical Therapist | 93 | 26 | |
Pharmacy | 125 | 33 | |
Laboratory Tech | 64 | 30 |
Key sectors in Sremska Mitrovica

Automotive components
Further development potential
- Sector with steady growth- employing more than 1,000 workers
- Continuous supply of qualified labor pool- Technical high-school with diverse profiles
- Strong export potential
- Local suppliers network
- Prominent companies in the sector: Eurozeit, Lames, Cooper Standard, Luvata

Agribusiness
Enduring tradition & high-quality resources
- Tradition in agricultural processing industry
- Previously 5 factories operating with over 3,000 qualified workers
- Access to skilled workforce with experience in the food processing sector
- Registered individual farmers- 7,398
- Wide network of potential local suppliers
- Successful companies- in the field of cereals & meat processing: Gierlinger holding, Mitsides point, Hrana Produkt, Provamin
Top 10 Employers in Sremska Mitrovica
Company | Sector | Country | #Employees |
---|---|---|---|
EATON ELECTRIC | Electronics | USA | 1,080 |
COOPER STANDARD | Automotive | USA | 600 |
VAHALI | Metal processing | Netherlands | 350 |
METALFER | Metal processing | United Kingdom | 300 |
GIERLINGER HOLDING - MITROS | Meat | Austria | 300 |
LUVATA | Automotive | USA | 200 |
MITSIDES POINT | Agribusiness | Cyprus | 170 |
LAMES | Automotive | Italy | 160 |
EUROZEIT | Automotive | Slovenia | 50 |
TERMOPRODUKS RS-1 | Construction | Austria | 50 |
Edited on 02/11/2022
Greenfield locations in Sremska Mitrovica
Location 1
Industrial Zone North
Land size: 85,2 ha
Vicinity of E70 highway
Detailed Regulation Plan has been adopted
Ownership: 10,1 ha Municipal
Infrastructure: electricity, water, gas, sewage, optical cable
For sale


Location 2
Industrial Zone Jezero
Land size: 24 ha
Available: 6,6 ha
In close proximity to E70 highway- 1.4 km
General plan has been adopted for this Industrial Zone
Ownership: 6,6 ha Municipal
Infrastructure: electricity, water, gas, sewage, optical cable
For sale
Upon receiving the investor’s request
the consolidated construction procedures are conducted in the following phases:
- Issuing the location conditions for the cadastre parcel suitable for construction – from the day of obtaining all special conditions, permits and other documents --> no later than 5 working days
- Issuing the construction permit – from the day of the submission of the request --> no later than 5 working days
Upon receiving the application:
Based on registering the construction work,issuing the verification for receiving the application without delay, provided that the complete documentation has been submitted.
- Registering the construction works to receive acceptance/rejection --> 5 working days
- Subsequently, submitting the request for infrastructure installations --> 3 working days
Issuing the occupancy permit, upon receiving the submission of the request --> no later than 5 working days
Issuing the final approval upon receiving the submission of the request --> no later than 5 working days
In total: 28 working days
Success Stories in Sremska Mitrovica

Your Partner in Municipality
Contact
Municipality Office
Branko Jakovljevic – Deputy Mayor for Investment and Local Economic Development
Phone: +381 22 610 556; +381 64 85 68 453
Email: kabinetsm@gmail.rs
Jelena Baljak – Head of Local Economic Development Office
Phone: +381 22 215 2095; +381 64 88 94 636
Email: smkler@gmail.com