Municipality of Alibunar
Alibunar is a town and municipality located in the South Banat District of the autonomous province of Vojvodina, Serbia. About 19000 inhabitants live in the town of Alibunar, a town of Banatski Karlovac and 8 settlements: Dobrica, Novi Kozjak, Ilandza, Seleus, Vladimirovac, Janosik, Lokve, and Nikolinci. Investment opportunities are in the agribusiness sector and in tourism development and improvement.

Alibunar Logistics
APATIN - Total Area: 620 km²
Distance from borders:
- HUN - 200 km
- CRO - 173 km
- ROM - 46 km
- BUL - 357 km
- B&H - 170 km
Distance from highway:
- E-75 - 65 km
- E-70 - 65 km
Distance from airport:
- Belgrade - 75 km
- Osijek (Croatia) - 234 km
- Temisoara (Romania) -121 km
- Budapest (Hungary) – 409 km

GAS
Municipality is gasified | 75 km |
Local pipeline lenght | 238 km |
Presure of main pipeline 42 bar | 42 bar |
Presure of local pipeline 1.325 bar | 1.325 bar |
GEOTHERMAL
25°C temperature | at 600 m |
ELECTRICITY
No.of distribution substations | 99 |
Total network lenght | 159 |
BIOMASS
Total land | 60,171 ha |
Agricultural land | 54,673 ha |
Arable land | 45,631 ha |
WIND
Average speed 5-6 m | at 50m |
SOLAR
Insolation – sunny days | 84 |
ROADS
Regional road network | 55 km |
Alibunar – Plandište Samos – Dobrica – B.Karlovci |
|
Local road network | 13 km |
Janosik - Ilandza Vladimirovac – Devojacki bunar |
WATERWAY
River Danube lenght | 35 km |
RAILWAY
Railway network Pancevo –Alibunar –Vrsac |
22 km |
SEWAGE
Sewage system | 30% |
Sewage network | 65 km |
Population, education and labor cost in Alibunar
Number of inhabitants 18,995
Employed (2019) 4,346
Unemployed (May 2019) 1,778
Labor cost structure
Average salary in Alibunar (March 2019)
NET Salary | 373 | |
Personal Income Tax | 10% | 39 |
Contributions (Emploeyee) | 19,9% | 102 |
GROSS Salary | 513 | |
Contributions (Employer) | 17,15% | 88 |
TOTAL Cost | 601 |
From July 1st, 2014, until December 31st 2019, the employers have the right for refund on the paid personal income tax & socal insurance contributions:
- 65% refund for employing 1-9 workers
- 70% refund for employing 10-99 workers
- 75% refund for employing 100+ workers
Education
High Schools
School | Profile | #students | #graduates |
---|---|---|---|
School of electrotechinac engineering „Dositej Obradovic“ | economics, finance, trade | 317 | 144 |
Key sectors in Alibunar

Agribusiness
- 46,665 ha of grain, vegetables and industrial plants
- 45% of the population is engaged in agriculture
- 2,727 registered agricultural holdings
- 10 registered farms
Orchards | Vineyards | Arable land | Gardens |
126 ha | 451 ha | 53,630 ha | 8,821 ha |
Livestock
- Cattle 4,689
- Pig 14,087
- Sheep and goats 8,845
- Livestock 313,460
- Horses 92
- Beehive 3,190

Tourism
- Geotermal sources: Devojacki bunar - 25°C, depth 600 m
- Hunting tourism: hunting area 53,436 ha
Top 10 Employers in Alibunar
Company | Sector | Country | #Employees |
---|---|---|---|
PARI LAB | Shoes production | Italy | 334 |
TIM DOO | Plastics | Serbia | 95 |
PEKARA SAN | Baking industry | Israel | 70 |
DOO STEF - TEX | Textile | Serbia | 38 |
DOO LOKVE | Agriculture | Serbia | 22 |
NIKOLINCI | Agriculture | Serbia | 19 |
DOO MARELA | Food industry | Serbia | 19 |
ROTO ALIBUNAR | Plastics | Slovenia | 18 |
PETAZE WIND DOO | Solar panels | Serbia | 14 |
SZTR PRIMERA | Baking industry | Serbia | 13 |
Greenfield locations in Alibunar
Location 1
Alibunar Zone1
Land size: 120 ha
Available: 120 ha
Ownership: municipal
For sale


Location 2
Banatski Karlovac – Zone 2
Land size: 20 ha
Available: 20 ha
Ownership: state
For sale
Location 3
Vladimirovac – Zone 1
Land size: 35 ha (outside of construction area)
Available: 35 ha
Ownership: state
For sale

Brownfield Locations in Apatin
Location 1
Agricultural corporation Napredak AD Alibunar
Land size: 9.26 ha
Facilities: 4,120 m²
Ownership: private
For sale and lease

Upon receiving the investor’s request
the consolidated construction procedures are conducted in the following phases:
- Issuing the location conditions for the cadastre parcel suitable for construction – from the day of obtaining all special conditions, permits and other documents --> no later than 5 working days
- Issuing the construction permit – from the day of the submission of the request --> no later than 5 working days
Upon receiving the application:
Based on registering the construction work,issuing the verification for receiving the application without delay, provided that the complete documentation has been submitted.
- Registering the construction works to receive acceptance/rejection --> 5 working days
- Subsequently, submitting the request for infrastructure installations --> 3 working days
Issuing the occupancy permit, upon receiving the submission of the request --> no later than 5 working days
Issuing the final approval upon receiving the submission of the request --> no later than 5 working days
In total: 28 working days
Success Stories in Alibunar

Your partner in Municipality
Kosa Nikolić/Head of Department of Agriculture
Phone: +381 13 641 - 355
Email: k.nikolic@ alibunar.org.rs