Ada

Municipality of Ada

Ada is a town and municipality in Vojvodina province, Serbia. It is situated in the central part of East Backa, on the right bank of the river Tisa. It occupies the area of 228,6 km2 on which about 19000 inhabitants live in 5 settlements: Ada, Mol, Sterijino, Utrine and Obornjaca. Ada has a very good geographical position that makes hunting, fishing, sport and recreation, country tourism possible.

Ada mapa

TOP 5 REASONS TO INVEST IN ADA

  • EU border proximity - 45 km
  • Modern industrial zone
  • Low operating expences
  • Developed SME sector
  • Regional leader in textile & metal processing

Ada Logistics

Distance from borders:

  • HUN - 45 km
  • CRO - 108 km
  • ROM - 42 km
  • BUL - 400 km
  • B&H - 160 km

Distance from highway:

  • E-75 - 50 km
  • E-70 - 110 km

Distance from airport:

  • Belgrade - 132 km
  • Osijek (Croatia) - 73 km
Logistics

Energy Potential in Ada

GAS
  • Municipality is fasified
  • Local pipeline lenght: 745 km
  • Presure of main pipeline1 bar
  • Presure of local pipeline 1 bar
BIOMASS
  • Total land: 22, 705 ha
  • Agricultural land: 18,197 ha
  • Arable land: 18,054 ha
  • 97 % available for biomass
ELECTRICITY
  • No of distribution substitusions: 98
  • Total power: 32 MVA
  • Total network lenght: 165 km
  • Avaliable capacities:
    • 2 new distribution substations to be operational: 1,000 kVA each
GEOTHERMAL
  • 63-64°C temperature: at 373 m

Infrastructure

ROADS

Regional road network

Becej-Ada-Senta, Novi Sad-Subotica: 10 km

Local road network

Ada-Mol Ada-Sterijina, Ada-Utrine, Ada-Obornjaca: 100 km

WATERWAY

River Tisa length: 14km

Port in Senta distance 20 km

Canal network lenght

Irrigation network/drainage canal network: 103 km

SEWAGE

Sewage system: 20 t

Sewage network: 110km

Water purifier; Main collector

Number of inhabitants 16,991

Employed (2020) 4.773

Unemployed (July 2021) 449

Labor Cost

Average salary in Ada (Dec 2020)

NET Salary 428
Personal Income Tax 10.00% 43
Contributions (Emploeyee) 19.9% 117
GROSS Salary 589
Contributions (Employer) 16.65% 98
TOTAL Cost 687

From July 1st, 2014 the employers have the right for a refund on the paid personal income tax & social insurance contributions:

  • 65% refund for eploying 1-9 workers
  • 70% refund for emplying 10-99 workers
  • 75% refund for emplying 100 + workers

Education

High Schools

School Profile #students #graduates
Technical Mechanical Technician 56 17
Computer Management Technician 84 16
Computer System Electro-Tech 85 22
Computer System Admin 21 /
Metal Processing 75 17
Building Construction 51 16
Textile 4 4
Car Mechanics / /

Opportunities to invest in Ada

Metal Proccessing

Main advantages:
  • Long-standing tradition – 100 years of success
  • Highly export-oriented industry
  • Specialized educational center with technical high-school ensuring constant workforce supply
  • Skilled workforce at competitive rates
  • No. 1 employer sector
  • Successful companies already present: Termometal doo, Agromerkur doo, Idas doo, Berko doo, T-1 doo
Metal processing

Investment opportunities:

- Brownfield locations – tailored for the metal processing industry

Agribusiness

Agribusiness

Main advantages:
  • 19,500 ha of arable lands
  • Easy access to abundant resource base for the processing industry
  • 100% of agricultural land is cultivated:
    • cereal crops - 97%
    • wheat – 4,000 ha; Maize – 12 ha
    • vegetables – 3%
    • tomato, peper, cucamber, parsley, carrot – 300 ha
  • Good cooperation potential with local farmers – financial incentives for purchasing agri-mechanisation

Textile

Main advantages:
  • Sector with traditionally good results – 70 year-long history
  • Strong export-orientation: 75% of total production is distributed worldwide
  • Expert high-school program – Apparel Textile
  • Cost-effective access to skilled labor pool
  • Presence of most prominent companies in the sector: Kooi knit doo, Pletex doo, Adanko doo, Belmil doo, Onicelli doo, Ferotehna doo, Leonardo doo
Textile

Investment opportunities:

- Brownfield locations – tailored for the textile industry

Tourism

Tourism

Excellent conditions for Spa center
Main advantages:
  • Therapeutical mud site - Orlovacsa
  • Historically renowned center for spa tourism in 19th century when there was a private spa center accommodating international visitors
  • Chemical analysis of water, identified the following elements: sodium, potassium, sulfur, magnesium, calcium, aluminum, manganese, iron, silicon, chlorine ions, carbonate ions, free carbonic acid; especially the dominant chemical compounds: sodium sulfate , magnesium sulfate , sodium chloride
  • The water has especially positive effects in the treatment of rheumatic and gynecological diseases
  • River Tisza (developed hunting & fishing tourism); sport activities
  • Rural, ecological tourism

Investment opportunities:

- SPA center development – at Orlovacsa location

Top 10 Employers in Ada

Company Sector Country #Employees
DOO TERMOMETAL Metal Processing SERBIA 284
BELMIL TEAM DOO Leather SERBIA 66
LPO Metal Processing ISRAEL 57
DOO T-1 Metal Processing SERBIA 56
KOOI KNIT DOO Textile SERBIA 53
LEONARDO DOO Textile SERBIA 47
ADANKO DOO Textile SERBIA 45
IDAS DOO Metal Processing SERBIA 36
FEROTEHNA DOO Leather SERBIA 31
AGROMERKUR DOO Metal Processing SERBIA 31
Edited on 02/02/2020

Greenfield locations in Ada

Location 1

Industrial Zone

Land size:150 ha

Ownership: 45 ha – municipal
105 ha – private

Infrastructure: electricity, water, gas

Available: 10 ha (municipal) + 90 ha (private)

For sale or lease

Malva doo

Upon receiving the investor’s request

the consolidated construction procedures are conducted in the following phases:

  • Issuing the location conditions for the cadastre parcel suitable for construction – from the day of obtaining all special conditions, permits and other documents --> no later than 5 working days
  • Issuing the construction permit – from the day of the submission of the request --> no later than 5 working days

Upon receiving the application:

Based on registering the construction work,issuing the verification for receiving the application without delay, provided that the complete documentation has been submitted.

- Registering the construction works to receive acceptance/rejection --> 5 working days

- Subsequently, submitting the request for infrastructure installations --> 3 working days

Issuing the occupancy permit, upon receiving the submission of the request --> no later than 5 working days

Issuing the final approval upon receiving the submission of the request --> no later than 5 working days

In total: 28 working days

Municipality Incentives

Land development fee

- discount 20%

Up to 0% Land Use Fees

for changing the land use (from agricultural to construction use)

Success Stories in Ada

Precise Casting Plant LPO DOO ADA

LPO logo

Your partner in Municipality

Municipality Office

Branislav Halgasev

Phone: +381 24 852 106 - ext.134 ; +381 62 173 11 74

Email: bhalgasev@ada.org.rs