Šid

Municipality of Šid

Sid is a town and municipality in the Syrmia District of Vojvodina, Serbia. Sid municipality has a population of 34,188. Šid municipality encompasses of town of Šid, and following villages: Adasevci, Batrovci, Bacinci, Berkasovo, Bikic Do, Bingula, Vasica, Visnjicevo, Gibarac, Erdevik, Ilinci, Jamena, Kukujevci, Ljuba, Molovin, Morovic, Privina Glava, Sot.

Šid mapa

TOP 5 REASONS TO INVEST IN ŠID

  • Favorable geo-strategic position: Proximity to EU borders Croatia, B&H; Highway E70; Railway; Danube, Sava rivers
  • Largest area covered with forest in Vojvodina – 21,024 ha
  • Highest arable land percentage 91% (36,363 ha)
  • Tourism development potential - High river density, natural resort - Fruska Gora, abundant geothermal resources
  • Available qualified workforce - Particularly for the agribusiness sector

Šid Logistics

Sid total area 687 km²

Distance from borders:

  • HUN - 163 km
  • CRO - 5 km
  • ROM - 173 km
  • BUL - 449 km
  • B&H - 30 km

Distance from highway:

  • E-75 - 62 km
  • E-70 - 13 km

Distance from airport:

  • Belgrade - 97 km
  • Osijek - 72 km
  • Temisoara - 217 km
Logistics

Energy potential in Šid

GAS
  • Municipality is under gasification process
    The network has been developed but the system has not been put into operation yet
  • Local pipeline lenght: 262 km
  • Presure on main pipeline 16 bar
  • Presure on local pipeline 4 bar
BIOMASS
  • Total land: 68,700 ha
  • Agricultural land: 41,588 ha
  • Arable land: 36,363 ha
  • Most common crops: corn, wheat, sugar beet, soy, sunflower
  • 30,000-50,000 t per year of crop residue for biomass
ELECTRICITY
  • No. of distribution substations: 217
  • Total power (kVA): 83,520
  • Total network length (km): 229+443
  • Available capatities (kVA): 20,000

- available capacities per buyer are limited to 10,000 kVA

- construction of the medium voltage infrastructure is needed (20kV power line, 20 kVA cable line, 20/0.4 kV substations)
after setting specific individual requirements for maximum power with the specific location of the future facility (factory)

WIND

Average speed 3.4 m/s at 10 m

GEOTHERMAL
Location Ilinci43°C - 1,027 m; 53°C - 1,060 m; 65°C - 1,120 m
Location Adasevci62°C - 1,124 m
Location Batrovci102°C - 2,300 m
Location Kukujevci67°C -1 ,320 m
Location Morovic190°C - 3,681 m
Location Sid35°C -8 50 m; 86°C - 2,064 m
Location Erdevik24°C - 460 m
SOLAR
Insolation 91 days p.a.2,000 hrs

Infrastructure in Šid

ROADS

Highway E70 lenght: 19 km

Regional road network: 70 km

  • Tovarnik-Sid-Kukujevci-Kuzmin
  • Adasevci-Morovic-Jamena-Racinovci
  • Ljuba-Erdevik-Bingula-Calma
  • Kukujevci-M118-Calma

Local road network: 69 km

WATERWAY

River network length: 37 km

- Rivers: Sava, Studva, Smogva, Debrnja, Bosut

- Port Leget in Sremska Mitrovica distance 40 km

Canal network lenght: 1,200 km

RAILWAY

Railway network length: 185 km

  • Belgrade-Sid
  • Sid-Border
  • Sid-Bijeljina

Axial pressure: 16 t

SEWAGE

Sewage system: 45%

Sewage network: 60 km

Population, education and labor cost in Šid

Number of inhabitants 34,188

Employed (2019) 7,381

Unemployed (April 2020) 2,029

Labor cost structure

Average salary in Šid (August, 2018)

NET Salary345
Personal Income Tax10.00%35
Contributions (Emploeyee)19.9%94
GROSS Salary475
Contributions (Employer)17.90%85
TOTAL Cost560

From July 1st, 2014, until December 31st 2019, the employers have the right for refund on the paid personal income tax & socal insurance contributions:

  • 65% refund for employing 1-9 workers
  • 70% refund for employing 10-99 workers
  • 75% refund for employing 100+ workers
Average Salary for Production sector in Vojvodina, November 2017

NET: € 398

GROSS: € 550

TOTAL COST: € 648

Average salary (total cost) for 2017 €560

Education

High Schools

SchoolProfile#students#graduates
GymnasiumGeneral25768
Economics12529
TechnicalsMechanical Tech for Computer Engineering8625
Car Mechanics6725
Tinware6767
Computer Electro-Tech10128
Agricultural Tech12025
Bakery8919

College

Business Managament

Profile#students
Marketing, Trade53
Business Communications3
Hospitality, Tourism3
Entrepreneurship-

Faculty

Management

Profile#students
Engineering managament24

Key sectors in Šid

Agribusiness

Agribusiness

Ample resources & easy access

  • Agricultural land – 41,588 ha with 91% of arable land
  • Majority of rural population – more than 6,500 people engaged in agriculture, over 3,300 registered farms
  • Most common crops: wheat 6,000 ha; maize, sugar beet, soy 936 ha, sunflower 360 ha
  • Favorable conditions for meat and milk processing development
  • Vegetable crops – 9% of total arable land: potato, cabbage, kale, melon, watermelon, tomato, pepper, onion
  • 115 registered livestock farms
  • Livestock count: Pigs 40,000; Poultry 200,000; Cattle 4,000; Sheeps 6,000; Goats 1,000
  • Successful companies: crude oils & fats, cereals, meat, milk processing

Investment opportunities:

- Meat processing

- Processing capacities development

Tourism

Tourism

Abudant geothermal potentials

  • Artificial reservoirs – lakes: Sot, Bruje, Moharac
  • Potential for development of sporting-recreational tourism, rural tourism, camping, cycling
  • Developed hunting tourism – rich forest grounds, small and large game, and birds – with hunting grounds are regularly maintained
  • Exclusive accommodation capacities present – but insufficient due to high demand
  • Well-known restaurants serving game specialties
  • Number of hunting associations – Srem, Vojvodina Sume, Neprecava
  • Fishing – rivers Sava, Bosut, Studva; lakes Moharac, Bruje, Sot
  • More than 32 fish species - pike, carp, roach chub, perch, catfish, etc.
Construction

Construction

Join our industry leaders

  • Celebrating of 35 years of tradition in construction
  • Presence of industry leaders - most successful companies in the sector
  • Network foreign partners 3 project construction branches in Serbia
  • vailable skilled workforce

Top 10 Employers in Šid

CompanySectorCountry#Employees
BIG BULL FOODSMeat processingSerbia306
VIKTORIJA OIL DOOAgribusinessSerbia279
AGROPUKMeat processingSerbia180
VALDOMPlastic processingSerbia70
MLINTESTCereal processingSerbia67
TIM IZOLIRKAConstructionSlovenia60
HEMPRO COLORChemical industryCroatia59
SIDPROJECTConstructionSerbia50
ILIJANUMPublishingSerbia50
L.A.B.B. GROUPAgribusinessSerbia50

Greenfield locations in Šid

Location 1

Industrial zone – Visnjicevo

Land size: 47.29 ha

Available: 47.29 ha

Ownership: municipality

*possibility of infrastructure development according to the agreement with the investor

** Detailed Regulation Plan development is in process

For sale & lease

Industrial zone – Visnjicevo
Industrial zone – Adasevci

Location 2

Industrial zone – Adasevci

Land size: 127,5 ha

Available: 110 ha

Infrastructure: electricity, water, optical cable

Ownership: state

*possibility of infrastructure development

** Next to Higway E70 and railway Sid-Bijeljina

For sale & lease

Brownfield Locations in Šid

Location 1

GRAFO-SET doo

Land size: 0.8 ha

Facilities: 1,250 m²

Infrastructure: electricity, water, sewage, optical cable

Ownership: private

For sale

GRAFO-SET doo
JIT TECHNIC doo

Location 2

JIT TECHNIC doo

Land size: 0.35 ha

Facilities: 1,600 m²

Infrastructure: electricity, water

Ownership: private

For sale and lease

Upon receiving the investor’s request

the consolidated construction procedures are conducted in the following phases:

  • Issuing the location conditions for the cadastre parcel suitable for construction – from the day of obtaining all special conditions, permits and other documents --> no later than 5 working days
  • Issuing the construction permit – from the day of the submission of the request --> no later than 5 working days

Upon receiving the application:

Based on registering the construction work,issuing the verification for receiving the application without delay, provided that the complete documentation has been submitted.

- Registering the construction works to receive acceptance/rejection --> 5 working days

- Subsequently, submitting the request for infrastructure installations --> 3 working days

Issuing the occupancy permit, upon receiving the submission of the request --> no later than 5 working days

Issuing the final approval upon receiving the submission of the request --> no later than 5 working days

In total: 28 working days

Incentives and Fees in Šid

Land Development Fee Reduction - Up to 99%

accordoing to new employment:

  • 30% reduction for 10-20 workers
  • 50% reduction for 21-30 workers
  • 99% reduction for 51+ workers
Land Development Fee Reduction - up to 99%

according to the investment value

  • 0% reduction for over EUR 1 million
  • 99% reduction for over EUR 3 million

Success Stories in Šid

logos

Your partner in Šid

Municipality Office

Dejan Kojic – Assistant Mayor

Phone: +381 22 719 142; +381 62 755 810

Email: ppzr@opstinasid.org

Branimirka Ridjosic – Director Local Development Office

Phone: +381 22 719 142; +381 62 755 821

Email: lokalnirazvoj@gmail.com

Predrag Vukovic - Mayor

Phone: +381 22 712 544; +381 62 755 289

Email: kabinetsid@mts.rs