Bačka Palanka

Municipality of Bačka Palanka

Backa Palanka is a city and municipality located in Vojvodina province of Serbia, on the left bank of the Danube. This municipality belongs to a group of larger municipalities in Vojvodina, with 12 villages (Backa Palanka, Celarevo, Obrovac, Tovarisevo, Karadjordjevo, Mladenovo, Nova Gajdobra, Gajdobra, Silbas, Despotovo, Pivnice, Parage). It also includes two small settlements in Srem (Nestin and Vizic).

Bačka Palanka mapa

TOP 5 REASONS TO INVEST IN BAČKA PALANKA

  • Favorable strategic location - Bordering Croatia-B&H-Serbia
  • International port on Danube - Pan-European Corridor 10 – linking 10 European countries
  • Economically developed - Presence of multinational & domestic companies, developed financial sector
  • Available skilled workforce
  • Abundant natural resources

Bačka Palanka Logistics

Distance from borders:

  • HUN - 78 km
  • CRO - 2 km
  • ROM - 135 km
  • BUL - 300 km
  • B&H - 51 km

Distance from highway:

  • E-75 - 50 km
  • E-70 - 42 km

Distance from airport:

  • Belgrade - 110 km
Logistics

Energy potential in Bačka Palanka

GAS
  • Municipality is gasified: 50%
  • Local pipeline lenght: 300 km
  • Presure of main pipeline 8 bar
  • Presure of local pipeline 1-4 bar
GEOTHERMAL
32°C temperature1,134 km
WIND

Average speed 3.5-4 m/s at > 50 m

BIOMASS
  • Total land: 57,900 ha
  • Agricultural land: 44,746 ha
  • Arable land: 43,516 ha
  • Most common crops: soy, maize, wheat, sugar beet
SOLAR
Insolation - 267 days per year2,198 hours
ELECTRICITY
  • No. of distribution substitusions: 379
  • Total power (kVA): 196,210
  • Total network length (km): 760
  • Energy supplied in 2013/14: 250,000 MWh
  • Available capacities: 58,863 kVA

Infrastructure in Bačka Palanka

ROADS

Regional road network: 119 km

  • Subotica-Sombor-Odžaci-B.Palanka-Novi Sad-Zrenjannin-Zitiste-N. Crnja-Romania
  • Nestin-Erdevik-Kuzmin-B&H
  • B.Topola-Kula-Despotovo-Silbas-B. Palanka-Croatia
  • Odzaci-Ratkovo-Silbas-Backi Petrovac-Rumenka-Novi Sad
  • Backo Novo Selo-Bac-Ratkovo-Despotovo-Sirig-Temerin-Zabalj
  • Croatia (Nestin)-Beocin-Sremska Kamenica
  • Gajdobra-Celarevo

Local road network: 252 km

WATERWAY

River Danube length: 35 km

International port in B. Palanka

DTD Canal network length Navigable in 29 km: 32 km

Canal network length (without DTD): 465 km

Reclamation ground: 130,000 ha

Irrigation network: 4,626 ha

RAILWAY

Railway network

Novi Sad-Gajdobra-Bogojevo, Gajdobra-B. Palanka: 29 km

Axial pressure: Novi Sad-Gajdobra-Bogojevo - 20t, Gajdobra-B. Palanka - 16 t (16-20 t)

SEWAGE

Sewage system: 90%

Settlements:

  • Backa Palanka 90%
  • Gajdobra 100%
  • Tovarisevo 100%
  • Karadjordjevo 95%
  • Mladenovo 35%
  • Celarevo, N, Gajdobra 95-98%

Sewage network: 139 km

Water purifier in Nova Gajdobra

Population, education and labor cost in Bačka Palanka

Number of inhabitants 55,528

Employed (2019) 14,451

Unemployed (April 2020) 4.122

Labor cost structure

Average salary in Bačka Palanka (March 2020)

NET Salary447
Personal Income Tax10%48
Contributions (Emploeyee)19,9%123
GROSS Salary618
Contributions (Employer)16,65%103
TOTAL Cost721

From July 1st, 2014 the employers have the right for refund on the paid personal income tax & socal insurance contributions:

  • 65% refund for employing 1-9 workers
  • 70% refund for employing 10-99 workers
  • 75% refund for employing 100+ workers

Education

High Schools

SchoolProfile#students#graduates
GymnasiumMathematical-Scientific16-
General18356
Social Linguistics10030
IT7724
Economics, Law, AdminEconomics244289
Finance11730
Business Admin56-
Trade, Hospitality, TourismTourism10725
Trade6222
Culinary10226
Hospitality68
TehnicalComputer Network Admin8020
Mechanical Tech-Computer Engineering8815
Electrotech - Computers4418
Electrotech - Energy4012
Computer Management Tech8314
Electrotech - IT4910
Electromechanics - AC Equipment2510
Car Mechanic36-
Locksmith3-

Key sectors in Bačka Palanka

Agribusiness

Agribusiness

Cereals, Vegetables, Fruits:

  • High-quality agricultural land – 43,516 ha of arable land
  • Favorable conditions for agro-ecological farming of cereals & vegetables
  • No land, air, water pollution and close proximity to abundant water resources – allowing organic production
  • 466 km of developed irrigation network for agricultural crops
  • Long production tradition & processing expertise
  • Great number of cooperatives and individual farmers (5,100) owning 34,200 ha (77%) of land
  • 6,000 ha of state-owned agricultural land allocated for leasing
Expansion potential

Expansion potential

Meat & dairy:

    Meat & dairy:
  • Most established farming of pigs, broilers, and hens
  • Number of registered facilities for livestock breeding - 60
  • Possibility for further development in cooperation with individual farmers
  • Livestock count: Cattle 4,000; Milk Cows 2,500; Sheep 12,500; Goat 2,300; Pigs 27,000; Poultry 242,500
Tourism

Tourism

Main advantages:

  • Significant natural resources – river Danube, lakes, hunting grounds
  • An established destination for cultural, manifestational, hunting, fishing, sporting activities, nautical, ecological and gastro-tourism
  • Geothermal – 4 boreholes in Karadjordjevo 500-1,000m with temperatures 32-36°C. Completed project for detailed hydrogeological research areas of Backa Palanka and deep exploration boreholes BCP -1 / HGT for multipurpose use of thermo-mineral water
  • Hunting grounds Karadjordjevo – game and pheasant farm (100,000 of 1-day old pheasants)
  • 70% of foreign tourists

Acomodation capacities

  • Hotels - 90
  • Restaurants lodging - 70
  • Hostels - 20
  • Resorts - 50
  • Villas - 20
  • Private - 20
Investment opportunities

Investment opportunities:

Spa center & Swimming pool complex investment project

  • Municipality – land plot ownership
  • Possibility for PPP with municipality
  • Urban planning documentation for the river coastal zone - under approval
  • Swimming pool complex – preliminary design
  • Main project developed for: open Olympic swimming pool, grandstand, hydro-center, mineral water well, open-air recreational swimming pool, children's pool, machine room, terrace with basement, catering facility
  • River regatta with additional facilities for international competitions.
  • Project draft completed, main project in development.
  • Marine development – for river cruisers.
Metal Processing

Metal Processing

  • Longstanding tradition in the field of metal processing and mechanical industry - with regionally well-known industrial systems
  • Available skilled workforce
  • Number of state owned companies in privatization process – with tradition and good resources
  • A number of Brownfield locations: Majevica Holding AD – under privatization
  • Available building land , incentives, efficient local administration
  • Developed SMEs and entrepreneurship in this area

Companies:

  • Majevica AD - Production of machinery for metalworking / under privatization
  • Majevica AD -Production of agricultural machinery / under privatization
  • Kovis DOO - Production of bearings, gears, gearing elements
  • Lival DOO - Production of tools
  • Sebastijan limarija Jedinstvo AD -Production of other metal products
  • Index VM DOO - Production of metal spare parts and tools for machine industry
Electronics

Electronics

Main advantages:

  • Developed sector of electro- installation and electro- mechanical industry
  • Available highly experienced and skilled workers
  • Developed SMEs sector in this area
  • Available building land , incentives, efficient local administration

Companies:

  • Nopal LUX DOO - Production of tools
  • Aling-Conel DOO - Production of other electrical equipment
  • EL-CO DOO - Production of other electical equipment

Top 10 Employers in Bačka Palanka

CompanySectorCountry#Employees
TARKETT DOOConstructionFrance1,074
NEKTAR DOOAgribusinessSerbia650
CARLSBERG SERBIAAgribusinessSweden527
DIV TRADES ADTextileSerbia232
REAL KNITTING DOOTextileHong Kong180
ALING-CONEL DOOElectricsSerbia170
UNIVEREXPORT BACKA ADAgribusinessSerbia148
DUNAV PREVOZ ADTransportationSerbia145
NPAL LUX DOOElectricsSerbia127
SEBASTIJAN LIMARIJA JEDINSTVO ADMetal processingSerbia112

Greenfield locations in Bačka Palanka

Location 1

Industrial Zone – Nova Gajdobra

Land size: 16,6 ha

Ownership: 16,6 ha state

Available: 11,85 ha

*electricity substation under construction

Tenants: Lival, Aling-Conel, Alwag, Al Rawafed

For sale & lease

Industrial Zone – Nova Gajdobra
Industrial Zone - Celarevo

Location 2

Industrial Zone - Celarevo

Land size: 3.14 ha

Ownership: municipality

*electricity, water, gas, sewage – nearby

Tenants: Carlsberg

For sale & lease

Location 3

Industrial Zone – Obrovac

Land size: 4.6 ha

Land plots: 17 parcels: 300-4,250m²

Ownership: municipality

*electricity substation power 2 x 630 kVA

*gas – nearby

*sewage – under construction

*port on Danube distance – 10 km

*highway distance – 35 km

*Croatia border distance – 10 km

Tenants: Aretol doo, MK Commerce

For sale & lease

Industrial Zone – Obrovac

Brownfield Locations in Bačka Palanka

Location 1

AD Merkur

Land size: 2.78 ha

Facilities: 16,099 m²

Ownership: municipality

Infrastructure: electricity, water, gas, sewage, optical cable

For sale & lease

AD Merkur

Incentives & Fees in Bačka Palanka

Land Development Fee

50% discount fee

for construction of facilities worth over € 1 mil:

  • While creating new employment for more than 30 workers
  • during a 4-year period

Environmental Fee

100% discount fee

  • During the first year of doing business for companies registered in Backa Palanka

70% discount fee

  • For taxpayers who invest their funds for the improvement of the environment in proportion to the invested funds - at least 0.01% annual revenues

Agriculture Develoment Fund Incentives

  • subsidies for insurance of agricultural production
  • interest subsidies to registered farms

Entrepreneurship Development Fund incentives - loans

Upon receiving the investor’s request

the consolidated construction procedures are conducted in the following phases:

  • Issuing the location conditions for the cadastre parcel suitable for construction – from the day of obtaining all special conditions, permits and other documents --> no later than 5 working days
  • Issuing the construction permit – from the day of the submission of the request --> no later than 5 working days

Upon receiving the application:

Based on registering the construction work,issuing the verification for receiving the application without delay, provided that the complete documentation has been submitted.

- Registering the construction works to receive acceptance/rejection --> 5 working days

- Subsequently, submitting the request for infrastructure installations --> 3 working days

Issuing the occupancy permit, upon receiving the submission of the request --> no later than 5 working days

Issuing the final approval upon receiving the submission of the request --> no later than 5 working days

In total: 28 working days

Success Stories in Bačka Palanka

logos

Your partner in Municipality

Municipality Office

Anna Feketeova – Local Economic Development Office

Phone: +381 21 2101 156; +381 64 8610 374

Email: ler@backapalanka.org.rs