Alibunar

Municipality of Alibunar

Alibunar is a town and municipality located in the South Banat District of the autonomous province of Vojvodina, Serbia. About 19000 inhabitants live in town of Alibunar, town of Banatski Karlovac and 8 settlements: Dobrica, Novi Kozjak, Ilandza, Seleus, Vladimirovac, Janosik , Lokve and Nikolinci. Investment opportunities are in agribusiness sector and in tourism development and improvement.

Alibunar mapa

Alibunar Logistics

APATIN - Total Area: 620 km²

Distance from borders:

  • HUN - 200 km
  • CRO - 173 km
  • ROM - 46 km
  • BUL - 357 km
  • B&H - 170 km

Distance from highway:

  • E-75 - 65 km
  • E-70 - 65 km

Distance from airport:

  • Belgrade - 75 km
  • Osijek (Croatia) - 234 km
  • Temisoara (Romania) -121 km
  • Budapest (Hungary) – 409 km
Logistics
GAS
Municipality is gasified75 km
Local pipeline lenght238 km
Presure of main pipeline 42 bar 42 bar
Presure of local pipeline 1.325 bar 1.325 bar
GEOTHERMAL
25°C temperatureat 600 m
ELECTRICITY
No.of distribution substations99
Total network lenght159
BIOMASS
Total land60,171 ha
Agricultural land54,673 ha
Arable land45,631 ha
WIND
Average speed 5-6 m at 50m
SOLAR
Insolation – sunny days84
ROADS
Regional road network55 km
Alibunar – Plandište
Samos – Dobrica – B.Karlovci
Local road network13 km
Janosik - Ilandza
Vladimirovac – Devojacki bunar
WATERWAY
DTD Canal network
River Danube lenght35 km
RAILWAY
Railway network
Pancevo –Alibunar –Vrsac
22 km
SEWAGE
Sewage system30%
Sewage network65 km

Population, education and labor cost in Alibunar

Number of inhabitants 18,995

Employed (2019) 3,451

Unemployed (April 2020) 1,818

Labor cost structure

Average salary in Alibunar (March, 2020)

NET Salary418
Personal Income Tax10%44
Contributions (Emploeyee)19,9%115
GROSS Salary577
Contributions (Employer)16.65%96
TOTAL Cost673

From July 1st, 2014 the employers have the right for refund on the paid personal income tax & social insurance contributions:

  • 65% refund for employing 1-9 workers
  • 70% refund for employing 10-99 workers
  • 75% refund for employing 100+ workers

Education

High Schools

SchoolProfile#students#graduates
School of electrotechinac engineering „Dositej Obradovic“economics, finance, trade317144

Key sectors in Alibunar

Agribusiness

Agribusiness

  • 46,665 ha of grain, vegetables and industrial plants
  • 45% of the population is engaged in agriculture
  • 2,727 registered agricultural holdings
  • 10 registered farms
OrchardsVineyardsArable landGardens
126 ha451 ha53,630 ha8,821 ha
Livestock
  • Cattle 4,689
  • Pig 14,087
  • Sheep and goats 8,845
  • Livestock 313,460
  • Horses 92
  • Beehive 3,190
Tourism

Tourism

  • Geotermal sources: Devojacki bunar - 25°C, depth 600 m
  • Hunting tourism: hunting area 53,436 ha

Top 10 Employers in Alibunar

CompanySectorCountry#Employees
PARI LABShoes productionItaly334
TIM DOOPlasticsSerbia95
PEKARA SANBaking industryIsrael70
DOO STEF - TEXTextileSerbia38
DOO LOKVEAgricultureSerbia22
NIKOLINCIAgricultureSerbia19
DOO MARELAFood industrySerbia19
ROTO ALIBUNARPlasticsSlovenia18
PETAZE WIND DOOSolar panelsSerbia14
SZTR PRIMERABaking industrySerbia13

Greenfield locations in Alibunar

Location 1

Alibunar Zone1

Land size: 120 ha

Available: 120 ha

Ownership: municipal

For sale

Alibunar Zone1
Banatski Karlovac – Zone 2

Location 2

Banatski Karlovac – Zone 2

Land size: 20 ha

Available: 17 ha

Ownership: state

For sale

Location 3

Vladimirovac – Zone 1

Land size: 35 ha (outside of construction area)

Available: 35 ha

Ownership: state

For sale

Banatski Karlovac – Zone 2

Brownfield Locations in Alibunar

Location 1

Agricultural corporation Napredak AD Alibunar/h4>

Land size: 9.26 ha

Facilities: 4,120 m²

Ownership: private

For sale and lease

Upon receiving the investor’s request

the consolidated construction procedures are conducted in the following phases:

  • Issuing the location conditions for the cadastre parcel suitable for construction – from the day of obtaining all special conditions, permits and other documents --> no later than 5 working days
  • Issuing the construction permit – from the day of the submission of the request --> no later than 5 working days

Upon receiving the application:

Based on registering the construction work,issuing the verification for receiving the application without delay, provided that the complete documentation has been submitted.

- Registering the construction works to receive acceptance/rejection --> 5 working days

- Subsequently, submitting the request for infrastructure installations --> 3 working days

Issuing the occupancy permit, upon receiving the submission of the request --> no later than 5 working days

Issuing the final approval upon receiving the submission of the request --> no later than 5 working days

In total: 28 working days

Success Stories in Alibunar

LPO logo

Your partner in Municipality

Dušan Dakić/ President

Phone: +381 13 642-105

Email: predsednik@alibunar.org.rs

Oliver Filipović / Advisor

Phone: +381 63 425 - 794

Email: o.filipovic@ alibunar.org.rs

Kosa Nikolić/Head of Department of Agriculture

Phone: +381 13 641 - 355

Email: k.nikolic@ alibunar.org.rs